Incheon New Port Stage I-1 Container Terminal Construction Project
- Hanjin Incheon Container Terminal(HJIT)
Details of the Facilities at the Terminal
Details of the Facilities at the Terminal Category m² py ① Operation Headquarters 3,893.86 1,180 ② CFS 5,443.29 1,650 ③ Front Gate 1,204.32 365 ④ Main Substation 957.63 290 ⑤ Gas Station 124.44 38 ⑥ Workshop 1,492.69 452 ⑦ Service Station Area - - ⑧ Water Treatment Plant 63.52 19 ⑨ Cleaning Area ⑩ Fire Extinguisher Cannon Facility 22.57 6.8 ⑪ Refrigerated Container Substation 492.83 149 ⑫ ARMGC Substation 159.00 48 ⑬ Worker Waiting Area 669.48 203 Hanjin Incheon Container Terminal(HJIT) Berthing Equipment Equipment at the Yard - Name : RMQC (Twin Lift System)
- Features : Possible to handle two 20FT containers simultaneously
- Manufacturer : ZPMC
- Handling Capacity : 45 units per hour
- Name : ARMGC
- Features : Yard automation at the horizontal placement wharf
- Manufacturer : ZPMC
- Handling Capacity : Operation of vessel’s own crane (remote) YT-ARMGC, Moving in and out operation (remote) ARMGC-YT